SAKC RC2 BOM

From Wiki-linuxencaja
Jump to: navigation, search

Template:Prioritybox

This BOM wiki page is the purpose only for quickly searching when you are interested with SIE V2 hardware development or circuits study.

The draft of V2 BOM is provided by Carlos. They p/n or price will undergo changes even before the PCB prototypes are fabricated.

The Substitution P/N is given by Sharism. 
The "Sourcing Status" column has following meaning with individuals:
DONE : already have stock in inventory.
ETA-1W : already placed order and the Estimated Time of Arrival within 1 week. Not in inventory yet.
ETA-2W : already placed order and the Estimated Time of Arrival within 2 weeks. Not in inventory yet.
NOT START : not ordered yet.
QUOTING : stage in guoting.

V2 BoM - source updated on 20101006

{{#get_external_data:http://downloads.qi-hardware.com/hardware/sakc/bom/rc2/sakc_bom_rc2.csv%7CCSV with header|item=ITEM|reference=REFERENCE|quantity=QUANTITY|manufacturer p/n=MANUFACTURER P/N|datasheet=DATASHEET LINK|description=DESCRIPTION|manufacturer=MANUFACTURER|package=PACKAGE|comment=COMMENT|unit price=UNIT PRICE|usage price=USAGE PRICE|substitution p/n=SUBSTITUTION P/N|substitution link=SUBSTITUTION LINK|sourcing status=SOURCING STATUS|note=NOTE}}

Item Reference Quantity Manufacturer P/N Manufacturer Description Package Comment Unit Price(USD) Usage Price(USD) Substitution P/N Sourcing Status Note {{#for_external_table:
{{{item}}} {{{reference}}} {{{quantity}}} [{{{datasheet}}} {{{manufacturer p/n}}}] {{{manufacturer}}} {{{description}}} {{{package}}} {{{comment}}} {{{unit price}}} {{{usage price}}} [{{{substitution link}}} {{{substitution p/n}}}] {{{sourcing status}}} {{{note}}}}}

Link

Personal tools
Namespaces

Variants
Actions
Navigation
Toolbox